Triplett - King & Associates  
arrow Search Site arrow Employment arrow Related Links Company News
PROJECT EXPERIENCE ACTIVE PROJECTS COMPANY AWARDS
 
COMPANY PROFILE OUR STAFF OUR SERVICES CONTACT US
Project Experience
  PROJECT EXPERIENCE

+ Transportation Services
- Design-Build
+ Construction Services
+ Construction Engineering & Inspection
+ Intelligent Transportation Systems

 

PROJECT EXPERIENCE

 
  Design - Build
 

I-85 Access Improvements Spartanburg Co., SC

Client Name / Address:
SCDOT,
 PO Box 191,
Columbia, SC 29202-0191

Design

Project Description:

Triplett-King & Associates (TKA) is a member of the design-build team currently working on the I-85 Access Improvements at GSP Airport and the BMW Manufacturing Facility in Spartanburg County, South Carolina.  This project consists of interstate widening and improvements, frontage road relocation, two grade separated intersections with I-85, and 6 new pre-stressed concrete beam bridges.   This project requires the contractor to perform Quality Control (QC) on all earthwork and asphalt related items.  TKA is responsible for performing all QC for the earthwork on the project including field testing, sampling, and document control for the contractor.  The majority of the earthwork has been a cut-fill operation which are challenging due to the continuously changing strata.  TKA has been able to facilitate the QC testing and inspection on a rigorous 7 day a-week schedule with no delays to the project.

     In addition to the contract obligations related to QC, TKA is providing geometric checks on all structural elements of the project, performing random samplings and working jointly with SCDOT to incorporate the highest level of quality into the project.    

 

 

+ I-520 Phase II of the Palmetto Parkway
- I-85 Access Improvements Spartanburg Co., SC

+ John Hardee Expressway
+ SC 526 Mark Clark Expressway over US 17 & SC 7
+ I-520 Palmetto Parkway Bridge over the Savannah River
+ Route 288 / I-64 Interchange (Ramps E, G & H)
+ Statewide Bridge Replacement Project
+ Trolley Run Station Bridge over Bridge Creek
+ Washington Bypass- Design Build
+ US 1-601 over Wateree River

 

 

 

 
 
HOME  |   COMPANY PROFILE  |  OUR STAFF  |  OUR SERVICES  CONTACT US  |  PROJECT EXPERIENCE  ACTIVE PROJECTS  |  COMPANY AWARDS  |  NEWS
COPYRIGHT © 2006 TRIPLETT - KING & ASSOCIATES. ALL RIGHTS RESERVED