Statewide Bridge Replacement Project 33 Maintenance Bridges
Client Name / Address:
SCDOT,
PO Box 191,
Columbia, SC 29202-0191

Project Description:
Triplett-King has teamed with United Contractors, U.S. Constructors, and Cape Romain Contractors for this first of a kind design-build project consisting of the design and construction of 33 bridges located throughout the state. Twenty of the bridges followed SCDOT Maintenance standards which included cored slab spans ranging from 40 to 60 feet. The remaining thirteen bridges were design bridges including flat slab spans, 70 ft. cored slab spans, and 120 ft. bulb tee spans. Triplett-King & Associates was responsible to deliver the design and construction plans for all 20 of the maintenance bridges, 8 of the design bridges, and provide construction inspection services for 11 bridges.
In conformance with the bid/award, 20 bridges must be constructed within 350 days. This aggressive project schedule demanded bridge plans to be produced within a short amount of time. Triplett-King & Associates also managed the other design team members including those responsible for roadway, environmental, geotechnical, hydrology, and right-of-way services. Close coordination with these team members was critical in meeting the aggressive schedule and meeting budget. The first-time use of 70 ft. cored slab spans also provided a cost savings to the SCDOT and reduced the impact from bents located in the waterway. In addition, Triplett-King & Associates construction inspection staff located throughout the state enabled manpower to be available at multiple sites at one time to meet the contractor’s needs.
|